Realisation of ferroconcrete works of the hotel complex of the French GROUPE ENVERGURE-CAMPANILE, KYRIAD PRESTIGE, PREMIERE CLASSE with 453 rooms, gastronomic background and parking lots. The hotels are located in the centre of Warsaw in the area of the Sobieski Hotel, 15 minutes from the airport.
|  |
|
|
|
Realisation of works of the raw state of the buildings Thermal Conversion of Sediment, Pumping Station of Technological Waters and the Tank of Buffer Sediment of the treatment plant in Bydgoszcz. For the realisation of the scope of works, the following will be used - approx. 1 300 m3 of concrete, - approx. 140 tons of reinforcement steel. |  |
|
|
Carried out in a prefabricated construction connected with monolithic ferroconcrete. Realisation of ferroconcrete works for the eastern stand with garage spaces. For the realisation of the carried out scope of the stadium, among others, the following will be used: - approx. 10 000 m3 of concrete in monolithic constructions, - approx. 6 000 m3 of concrete in prefabricates, - approx. 1 000 ton of reinforcement steel. |  |
|
|
Location of a 16-floor residential building with a section for services on the ground floor and 2 levels of underground garages at 6 Orzycka Street in the neighbourhood of Galeria Mokotów. Carpentry and concrete works of the entire construction of the building carried out.
|  |
|
|
Two independent warehouse and exhibition halls with an office background of “F. D. S. Hi-Tech Business Center" at 79 Aleja Krakowska in Nowy Sękocin. Carpentry, concrete and reinforcement works of ferroconcrete elements of the construction of the object were carried out.
|  |
|
|
Hilton Hotel is situated in a modern, 29-floor building at the corner of Grzybowska and Wronia Streets. It has 314 large rooms, including apartments. The hotel has high-standard conference rooms of a total area of 3000 m2. It construction began the land development of this region on which apartment buildings, shopping centres and an underground building will be established. Works of the state “0” carried out, among others, ceiling on the ground and a tie beam of sheet pile walls.
|  |
|
|
Residential and services building with an underground garage, where a number of companies providing services is located – medical, bank, consulting, stores. At the same time, a fantastically situated apartment building in the centre of the capital. Carrying out carpentry and concrete works of the construction of the building.
|  |
|
|
Reconstruction of the existing viaduct over the operating railway line and electric supply line. New road slab with pavements on the ferroconcrete foundation carried out on the steel structure of load-bearing spans of a length of 30 m. The entire works of ferroconcrete road slab and pavements carried out.
|  |
|
|
|
|
|